a
afkar_a

Afkar A

@afkar_a

Mechanical Engineer

Indonesië
Engels, Indonesisch
Sommige informatie wordt in het Engels weergegeven.
Over mij
I am a detail-oriented Mechanical Engineering graduate with expertise in mechanical design (CAD and FEA), predictive maintenance, and technical troubleshooting. I have practical experience in paper manufacturing and the cement industry, alongside a proven track record in managing mechanical workshops and leading prototype vehicle design projects. I am eager to leverage my analytical and leadership skills to drive operational excellence and innovative engineering solutions.... Lees meer

Skills

a
afkar_a
Afkar A
offline • 

Bekijk mijn diensten

Ontwerpbeoordeling en -advies
I will do something i really good at 3d model design in engineering

Werkervaring

APP_Group

Maintenance Reliability Engineer Trainee

APP Group • Fulltime

Mar 2026 - Jun 2026 • 3 mos

Analyzed end-to-end paper making processes and power plant integration. Implemented Basic Safety, Industrial Hygiene, and 5S standards. Applied Total Productive Maintenance (TPM) and Root Cause Analysis (RCA) during field troubleshooting. Collaborated with senior mechanics to dismantle press section rolls and replace centrifugal pump bearings. Presented technical findings to enhance workshop efficiency.

Universitas_Andalas

Mechanical Drawing Crew Assistant Lecturer

Universitas Andalas • Parttime

Jul 2022 - Aug 2025 • 3 yrs 1 mo

Instructed mechanical engineering students on reading and creating technical drawings, focusing on 2D, Isometric views, and GD&T standards. Assisted lecturers in providing instructions for drawing assignments and evaluated student results using CAD software.

PT_Semen Padang

Maintenance Engineer

PT Semen Padang • Fulltime

Aug 2024 - Sep 2024 • 1 mo

Executed maintenance on apron feeder conveyors and coal mill gate valves. Performed preventive maintenance on rotary kilns and vertical coal mills. Conducted technical failure analysis using Finite Element Analysis (FEA) to model spring stress and fatigue life, recommending a 5-year preventive maintenance schedule.