I will build your ms project construction schedule with critical path and updates
Construction Project Manager, Estimating, Takeoffs, Bluebeam
Over deze dienst
I'm a working Construction Project Manager with 15 years of experience overall: residential, commercial, and heavy civil, including heavy highway and bridge work, plus a degree in Construction Management. I do MS Project construction scheduling and project scheduling for real jobs: DOT progress submittals with narrative and cash-flow curve, bid and award baselines, and updates once the job moves.
Send me your scope and contract dates and I'll build a plan that holds up: real logic ties, a critical path that actually calculates, milestones and interim dates built in, and calendars that match how the work runs: 5-day, 6-day, shutdown windows.
You get the editable .mpp file and a clean PDF Gantt you can hand to an owner, a GC, or a DOT reviewer.
How it works: 1. You send the scope, contract dates, and required milestones. 2. I confirm the fit and flag any dates the logic can't reach. 3. You get the file, the PDF, and on Standard and Premium, the narrative and cash-flow curve.
Microsoft Project only; no Primavera P6. It's a planning tool: final sequencing and means-and-methods stay with the contractor running the work.
Domein:
Zakelijk
Branche:
Bouw
Taal:
Engels
Mijn portfolio
Veelgestelde vragen
Do you build schedules in Primavera P6?
No. Microsoft Project is my tool, and it's what this service is. If your contract requires a P6 native file, I'm not your guy and I'll tell you that before you spend anything.
What do you need from me to start?
The scope, the contract dates, and the milestones: the full list is in the requirements. If you don't have an activity breakdown yet, send the scope description and plans and I'll build the activity list as part of the job; it fits best in Standard or Premium.
Can you update a schedule somebody else built?
Yes, if you have the .mpp file. Send it with your actuals (starts, finishes, percent completes) and I'll update progress, re-run the logic, and show you where the critical path moved. Standard includes one update; Premium includes two.
My owner or DOT reviewer rejected my schedule. Can you fix it?
Usually, yes. Send the file and the review comments. Rejected schedules are usually a logic problem: missing ties, wrong calendars, constraints doing the work logic should do. Those are fixable. I'll tell you up front if yours needs a rebuild instead of a repair.
Is the finish date in my contract even possible?
I'll check it against the logic before I build the whole thing. If the dates can't be met with the scope as given, you get that answer in writing with the reasons: better from me at the start than from your reviewer or, worse, in the field.
Do you write the narrative DOT reviewers ask for?
Yes. Standard and Premium include the written narrative in the state progress-schedule format (sequence of work, controlling operations, how milestones are met), plus the cash-flow curve. That's work I've done on live DOT contracts.

