I will make rams, job safety analysis n activity hazard analysis reports

Sommige informatie wordt in het Engels weergegeven.
5,0
5,0

Pakistan

Ik spreek Engels, Urdu, Arabisch

434 bestellingen voltooid

ll MS Civil ll ll QHSE Consultant ll ll Risk Assessment Expert ll

Serving 300+ unique clients and delivering over 600 projects Worldwide, I am an M.Sc. Civil Engineer, Certified QHSE Consultant, with over 11 years of experience in Construction, Engineering, Industri...

Niveau 2

Voldoet aan hoge prestatiecriteria en heeft een bewezen staat van dienst in het voldoen aan de verwachtingen van de klant.

Over deze dienst

With 200+ unique Clients and over 500 completed projects Worldwide.


I make Method Statements, RAMS, SWMS, Health & Safety Policy (H&S), Company Safety Manual, HACCP Plans, Traffic Management Plan, Job Safety Analysis, and Incident and Accident Report.

[With a guarantee of acceptance by Client].

 

I am an M.Sc Civil Engineer, HSE Consultant, QA/QC Manager with 10+ years of professional experience in the Construction, Engineering, Industrial, & Manufacturing sectors worldwide.


It includes:-

  1. Risk Assessment Method Statement (RAMS)
  2. Safe Work Method Statement (SWMS)
  3. Waste Handling and Management
  4. Construction Phase Plan (CPP)
  5. Logistics and Traffic Management Plan
  6. Health and Safety Policy (H&S)
  7. Accident Prevention Plan (APP)
  8. Occupational Health and Industrial Hygiene Management (OHIH)
  9. Job Safety Analysis (JSA)
  10. Job Hazard Analysis (JHA)
  11. Activity Hazard Analysis (JHA)
  12. Risk Assessment (RA)
  13. Experienced in making submissions to Local Authorities, especially for UAE, NZ, AUS, KSA, CAD, UK, and USA as per ISO 9001, DIN EN ISO 12100 & 13849, ISO 14001, ISO 45001, Safework Australia, CCOHS, HSE UK standards.

 

Note: Please discuss your project before order.

Type document:

Gebruikers- en trainingshandleidingen

Branche:

Productie

Taal:

Engels

Voorkeur voor een leveringsstijl

Laat het de freelancer weten als je voorkeuren voor of zorgen hebt over het gebruik van AI-tools voor het voltooien en/of leveren van je bestelling.

Klanten waar ik mee heb gewerkt
Kohler Co.

Kohler Co.

Industrial Manufacturing & Storage

OPERATION & MAINTENANCE (O&M) MANUAL FOR ELECTRICAL & POWER FACILITIES

jun 2023-jun 2023

Mijn portfolio

Reviews

12 reviews van deze dienst
5,0

(12)
(0)
(0)
(0)
(0)
Specificering van de beoordeling
  • Communicatieniveau van de freelancer
    5
  • Kwaliteit van de levering
    5
  • Waarde van de levering
    5
Sorteer op
Meest relevant
  • B

    brttnfstr

    US

    Verenigde Staten

    Lopende samenwerking
    5

    Repeat Customer

    US$ 100-US$ 200

    Prijs

    5 dagen

    Looptijd

    Nuttig?
    Ja
    Nee
  • N

    nadzmaree88

    AU

    Australië

    Lopende samenwerking
    5

    Incredible efficiency and work

    US$ 100-US$ 200

    Prijs

    1 dag

    Looptijd

    Nuttig?
    Ja
    Nee
  • M

    mohaneda

    SA

    Saoedi-Arabië

    Lopende samenwerking
    5

    Thank you mr

    US$ 200-US$ 400

    Prijs

    2 dagen

    Looptijd

    Nuttig?
    Ja
    Nee
  • S
    image-docs

    stephenmaher414

    IE

    Ierland

    5

    It was very easy working with Nauman! I needed something that I didn’t quite fully understand and he went above and beyond to help me meet the requirements. Would 100% recommend.

    US$ 200-US$ 400

    Prijs

    4 dagen

    Looptijd

    Nuttig?
    Ja
    Nee
  • J

    josephal24

    CA

    Canada

    Lopende samenwerking
    5

    I was very satisfied with Nauman’s work on our RAMS document. He quickly understood the brief and delivered a clear, well-organized, and technically strong report. He was persuasive in his writing, highly cooperative, and always polite and professional. His adaptability and responsiveness made the process smooth. I’d gladly work with him again.

    US$ 50

    Prijs

    4 dagen

    Looptijd

    Nuttig?
    Ja
    Nee
Reviews

12 reviews van deze dienst
5,0

(12)
(0)
(0)
(0)
(0)
Specificering van de beoordeling
  • Communicatieniveau van de freelancer
    5
  • Kwaliteit van de levering
    5
  • Waarde van de levering
    5
Sorteer op
Meest relevant
  • B

    brttnfstr

    US

    Verenigde Staten

    Lopende samenwerking
    5

    Repeat Customer

    US$ 100-US$ 200

    Prijs

    5 dagen

    Looptijd

    Nuttig?
    Ja
    Nee
  • N

    nadzmaree88

    AU

    Australië

    Lopende samenwerking
    5

    Incredible efficiency and work

    US$ 100-US$ 200

    Prijs

    1 dag

    Looptijd

    Nuttig?
    Ja
    Nee
  • M

    mohaneda

    SA

    Saoedi-Arabië

    Lopende samenwerking
    5

    Thank you mr

    US$ 200-US$ 400

    Prijs

    2 dagen

    Looptijd

    Nuttig?
    Ja
    Nee
  • S
    image-docs

    stephenmaher414

    IE

    Ierland

    5

    It was very easy working with Nauman! I needed something that I didn’t quite fully understand and he went above and beyond to help me meet the requirements. Would 100% recommend.

    US$ 200-US$ 400

    Prijs

    4 dagen

    Looptijd

    Nuttig?
    Ja
    Nee
  • J

    josephal24

    CA

    Canada

    Lopende samenwerking
    5

    I was very satisfied with Nauman’s work on our RAMS document. He quickly understood the brief and delivered a clear, well-organized, and technically strong report. He was persuasive in his writing, highly cooperative, and always polite and professional. His adaptability and responsiveness made the process smooth. I’d gladly work with him again.

    US$ 50

    Prijs

    4 dagen

    Looptijd

    Nuttig?
    Ja
    Nee