Need a code compliant electrical load calculation and panel schedule for a permit submittal, panel upgrade, or new build?
Overestimating service size wastes money, while underestimating risks overloaded breakers and permit rejections. I deliver clear NEC Article 220 load calculations and panel schedules for contractors, architects, and project engineers.
WHAT THIS GIG DOES:
- NEC Article 220 Load Calculation: General lighting, receptacle, appliance, motor, and continuous load calculations per standard or optional methods.
- Demand Factor Analysis: Code compliant demand factors applied to lighting, cooking, dryer, HVAC, and commercial loads.
- Panel Schedule Creation: Balanced phase loads (L1/L2 or A/B/C), circuit descriptions, breaker pole/amp ratings, and total connected vs. demand amps.
- Service & Feeder Sizing Check: Main breaker and feeder ampacity check to support upgrades, EV chargers, or new equipment.
Send your circuit list or floor plan to receive a clean PDF report and unlocked Excel sheet. Order now!
Projectschaal:
Gebouw
Type gebouw:
Residentieel
•
Commercieel
•
Kantoor en werkruimte
Voorkeur voor een leveringsstijl
Laat het de freelancer weten als je voorkeuren voor of zorgen hebt over het gebruik van AI-tools voor het voltooien en/of leveren van je bestelling.
Andere Bouwtechniek diensten die ik aanbied
Veelgestelde vragen
Which NEC edition and calculation methods do you use?
I follow NEC Article 220 (standard and optional methods, including residential optional calculations where applicable) using current code tables. Let me know if your local authority having jurisdiction (AHJ) specifies a particular NEC cycle when you order.
What deliverables will I receive when the order is complete?
You receive a clean, organized PDF report and panel schedule formatted for easy review or permit package inclusion, plus an unlocked Excel workbook with transparent formulas and demand factor breakdowns.
Do you balance loads across phases on the panel schedule?
Yes. Circuits are assigned across phases (L1/L2 for single phase split systems or A/B/C for three-phase systems) to keep phase currents balanced and flag high draw appliances or continuous loads.
Can you check if an existing panel has room for an EV charger, heat pump, or sub panel?
Yes. Share your existing main breaker rating and connected/existing loads in the requirements, and I will verify whether your current service capacity supports the added load or requires an upgrade.