m
mirtaimoor151

MirTaimoor

@mirtaimoor151

Civil Site Engineer QA QC Tunnel Expert Dasu Tarbela

Pakistan
Engels, Urdu, Chinees
Sommige informatie wordt in het Engels weergegeven.
Over mij
Civil Site Engineer | 11+ Years (14 May 2015 - 25 Jun 2026) | 3 Mega Dams: Neelum Jhelum 969MW (14 May 2015-08 Nov 2018) → Dasu 4300MW (20 Jan 2019-10 Oct 2024) → Tarbela T5 1530MW (21 Jan 2025-25 Jun 2026) | QA/QC Expert. What I will do for you: I prepare 100% Professional QA/QC Documents that Consultants Approve quickly: - ITP, RFI,AFI,Method Statement - Pour Cards,Checklists,Daily Reports - Tunnel Excavation & Rock Support Logs My documents are based on real site experience, i Worked directly with Chinese Experts. If you want your site documentation approval-ready, let's talk.... Lees meer

Skills

m
mirtaimoor151
MirTaimoor
offline • 

Bekijk mijn diensten

Technische teksten
I will prepare itp, method statement and QA qc documents for civil construction

Portfolio

Werkervaring

PCCCL_(Power China construction company limited)

Site Engineer

PCCCL (Power China construction company limited) • Fulltime

Jan 2025 - Jun 2026 • 1 yr 5 mos

Deployed as Site Engineer on Tarbela 5th Extension Hydropower Project (1530MW) - World's largest earth-fill dam. ▪ Responsible for QA/QC of Tunnel Excavation, Shotcrete, Rock Bolting, Steel Ribs & Concrete Lining. ▪ Prepared and maintained Tunnel Face Mapping Logs, Rock Support Records, and Grouting Reports. ▪ Reviewed contractor's RFIs, ensured compliance with WAPDA / FIDIC specifications before consultant approval. ▪ Conducted daily site inspections and coordinated with Geologists & Chinese technical team to resolve NCRs.

CGGC

Site Engineer

CGGC • Fulltime

May 2015 - Oct 2024 • 9 yrs 5 mos

Worked as Civil Site Engineer QA/QC on Pakistan's biggest Mega Projects - Dasu Hydropower 4300MW, and Neelum Jhelum 969MW with CGGC/CMEC Key Responsibilities: ▪ Prepared & got approval for QA/QC documents: ITP, RFI, AFI, Method Statements, Checklists, Pour Cards, Daily Reports. ▪ Managed Tunnel Excavation & Rock Support logs, ensured work as per WAPDA & FIDIC standards. ▪ Coordinated directly with Chinese experts & Consultants for quick approval. ▪ 09+ years of site execution experience in dam & tunnel construction.