s
s_nadeeshan

NADEESHAN

@s_nadeeshan
5,0(3)

NUBER IS DIFFERENT FROM QUANTITY

Sri Lanka
Engels
Sommige informatie wordt in het Engels weergegeven.
Over mij
I'm experienced in designing work-Structural, Quantity surveyors in Cost Estimation, Quantity takeoff, Preparing BOQ, Rate Analysis, 2D floor plans, tender, and Lumion/SketchUp Rendering. I have worked in the Consultancy Company in Sri Lanka (CS1). I can provide your requirement with passion and dedication with significant accuracy. Furthermore, I have obtained the Assistant QS and the Diploma in QS. I have also received an HND from Cardiff Metropolitan University and BSC from Liverpool University. Project: Commercial building, Hotels, Apartment, Residential House, Bridges, Sports Complex.... Lees meer

Skills

s
s_nadeeshan
NADEESHAN
offline • 
Gemiddelde reactietijd: 8 uur

Bekijk mijn diensten

Materiaalafname en kostenraming
I will do material take off bill of quantity cost estimation works
5,0(3)
Materiaalafname en kostenraming
I will do cost estimation, quantity takeoff, material takeoff, etc

3 Reviews
5,0

(3)
(0)
(0)
(0)
(0)
Specificering van de beoordeling
  • Communicatieniveau van de freelancer
    5
  • Kwaliteit van de levering
    5
  • Waarde van de levering
    5
1-3 van 3 reviews
Sorteer op
Meest relevant
    X
    image-docs

    xooponline

    Terugkerende klant

    AG

    Antigua en Barbuda

    5

    I was very pleased with the work. He was responsive and went above and beyond

    Tot maximaal US$ 50

    Prijs

    2 dagen

    Looptijd

    gig

    Materiaalafname en kostenraming

    Werkvoorbeeld
    Nuttig?
    Ja
    Nee
    D

    damian_melis

    RS

    Servië

    5

    Very thorough and good at detaild architect. Recommend him allso for his communication and fast response

    Tot maximaal US$ 50

    Prijs

    8 dagen

    Looptijd

    gig

    Materiaalafname en kostenraming

    Nuttig?
    Ja
    Nee
    D

    davidbradley375

    GB

    Verenigd Koninkrijk

    5

    Excellent work, a pleasure to work with

    Tot maximaal US$ 50

    Prijs

    8 dagen

    Looptijd

    gig

    Materiaalafname en kostenraming

    Nuttig?
    Ja
    Nee