I will prepare method statements, risk assessments and rams

Sommige informatie wordt in het Engels weergegeven.

Bahrein

Ik spreek Urdu, Engels, Duits, Arabisch

Facilities Engineer

Mechanical and Chemical Engineering graduate with extensive experience in facility operations, MEP team supervision, and contractor management. Specializes in managing multidisciplinary technical proj...
Over deze dienst

I prepare professional Method Statements, Risk Assessments, and RAMS for engineering, MEP, facilities, maintenance, installation, and other technical activities.

The basic package includes documentation for one activity, covering the work sequence, hazards, control measures, PPE, and relevant safety requirements.

Basic package: $15

Delivery: 3 days

Revisions: 1

Additional services are available for extra activities, faster delivery, additional revisions, references and citations, or extra word count.

Additional activity: +$15 and +1 day.

Type document:

Documentatie

•

Standaard werkprocedures

Branche:

Engineering

Taal:

Engels

Voorkeur voor een leveringsstijl

Laat het de freelancer weten als je voorkeuren voor of zorgen hebt over het gebruik van AI-tools voor het voltooien en/of leveren van je bestelling.