s
shokatalikha9

Shokat Ali

@shokatalikha9
5,0(11)

Level 1

Construction Cost Estimator GC, Renovation, Addition

Pakistan
Engels
Sommige informatie wordt in het Engels weergegeven.
Over mij
With 5+ years of experience, I specialize in delivering precise material takeoffs and cost estimates for Electrical, Plumbing, HVAC, and all other CSI Trades. I've estimated over $40M in projects and completed 1,200+ takeoffs, including a guaranteed bid win at Atlanta International Airport. Proficient in PlanSwift, BluBeam, and Excel, I provide accurate results with fast turnaround and attention to detail. Whether it’s new construction, renovation, or additions, I help clients save time, reduce costs, and win bids. Let’s discuss your project today!... Lees meer

Skills

s
shokatalikha9
Shokat Ali
US$ 20/uur
offline • 
Gemiddelde reactietijd: 1 uur

Bekijk mijn diensten

Materiaalafname en kostenraming
I will do site work, earthwork, landscape, utility package takeoffs
5,0(8)
Materiaalafname en kostenraming
I will accurate material takeoff, quantity takeoff, and construction cost estimate
5,0(2)

Wil je op uurbasis werken?

Vertel Shokat Ali wat je nodig hebt.

US$ 20

/

uur

Portfolio

Werkervaring

Project Manager

Peakview Estimation • Fulltime

Sep 2024 - Present1 yr 8 mos

Managing construction estimating and bid preparation for residential and commercial projects. Reviewing architectural and structural drawings, coordinating with estimators, and ensuring accurate quantity takeoffs and cost estimates using PlanSwift and Excel. Overseeing project timelines, maintaining communication with contractors, and ensuring bids are delivered accurately and on schedule.

Senior Estimation Engineer

Constructem • Fulltime

Mar 2023 - Sep 20241 yr 6 mos

Prepared detailed quantity takeoffs and cost estimates for residential and commercial projects using PlanSwift and Excel. Reviewed architectural, structural, and civil drawings to develop accurate BOQs and bid proposals. Managed estimating workflows, ensured quality control of takeoffs, and supported contractors in submitting competitive bids within tight deadlines.

Junior Estimation Engineer

Urban Estimation • Fulltime

Feb 2020 - Feb 20233 yrs

Delivered accurate quantity takeoffs and cost estimates for residential and commercial projects using PlanSwift and Excel. Reviewed architectural, structural, and civil drawings to quantify materials and prepare clear BOQs for bid proposals. Improved estimating efficiency through organized Excel templates and contributed to multiple successful bids. Awarded Employee of the Year twice for accuracy and consistent performance.

11 Reviews
5,0

(11)
(0)
(0)
(0)
(0)
Specificering van de beoordeling
  • Communicatieniveau van de freelancer
    5
  • Kwaliteit van de levering
    5
  • Waarde van de levering
    5
1-5 van 11 reviews
Sorteer op
Meest relevant
    L

    leeobolivar

    Terugkerende klant

    US

    Verenigde Staten

    5

    Good work, Thanks

    Tot maximaal US$ 50

    Prijs

    1 dag

    Looptijd

    gig

    Materiaalafname en kostenraming

    Nuttig?
    Ja
    Nee
    L

    leeobolivar

    Terugkerende klant

    US

    Verenigde Staten

    5

    Good delivery; I will continue working with him on my upcoming projects.

    Tot maximaal US$ 50

    Prijs

    1 dag

    Looptijd

    gig

    Materiaalafname en kostenraming

    Werkvoorbeeld
    Nuttig?
    Ja
    Nee
    L

    leeobolivar

    Terugkerende klant

    US

    Verenigde Staten

    5

    Nice guy, i wanted a quick site work and he did a excellent job.

    Tot maximaal US$ 50

    Prijs

    1 dag

    Looptijd

    gig

    Materiaalafname en kostenraming

    Nuttig?
    Ja
    Nee
    J

    jc_lefloch

    Terugkerende klant

    FR

    Frankrijk

    5

    Very good job. In Time

    US$ 100-US$ 200

    Prijs

    10 dagen

    Looptijd

    gig

    Materiaalafname en kostenraming

    Nuttig?
    Ja
    Nee
    R
    image-docs

    reece_moff

    AU

    Australië

    5

    Great work will use again

    US$ 100-US$ 200

    Prijs

    4 dagen

    Looptijd

    gig

    Materiaalafname en kostenraming

    Nuttig?
    Ja
    Nee