t
thanh_lta

Thanh

@thanh_lta

I will create 3D models of MEP systems for factories and buildings

Vietnam
Engels
Sommige informatie wordt in het Engels weergegeven.
Over mij
1. Design mechanical and electrical systems for factories and buildings 2. Deploy construction drawings of mechanical and electrical systems on Cad 2D, Revit MEP 3. Collision control of electromechanical systems using Revit 4. Build a 3D model of the system from a 2D file... Lees meer

Skills

t
thanh_lta
Thanh
offline • 
Gemiddelde reactietijd: 1 uur

Bekijk mijn diensten

HVAC
I will create 3d models of mep systems for factory and building

Portfolio

Werkervaring

Tan_Phat Long Engineering Corporation

MEP-Engineer

Tan Phat Long Engineering Corporation • Fulltime

Sep 2023 - Present • 3 yrs 1 mo

-Full MEP BIM coordination for both office and production facility. Delivered combined 3D model across all four disciplines simultaneously — electrical (cable tray, conduit, panels), HVAC (chiller, AHU, FCU, ductwork), fire protection (full sprinkler network), and plumbing. Executed clash detection and produced construction shopdrawings. -Full MEP BIM implementation for a large-scale logistics warehouse. Key highlight: Seismic Bracing modeled at LOD 350 — complete mechanical connection details including clamps, threaded rods, and base plates, ready for direct construction without supplementary drawings. Fire protection system covers entire warehouse footprint. -Full electrical system BIM for a GMP-standard pharmaceutical plant. Delivered complete MDB/DB panel layout and cable tray routing across all floor levels. Model produced with exploded-layer separation per floor — clearly communicating routing paths, vertical risers, and horizontal distribution for each level independently -BIM model for sanitary and storm drainage systems of a biomass-fired boiler house. Beyond standard modeling, produced 3D construction method simulations including pipe hoisting sequences with crane and scaffolding, and wall-cutting penetration marking — enabling the construction crew to execute precisely without additional briefing. Full chiller plant BIM modeling including CHW, HW, and CW piping systems for an industrial facility at VSIP 3. Delivered detailed 3D models and construction sections for all equipment groups: chiller units (CHWS/CHWR DN200–450), heat recovery chillers, chilled water pump arrays, hot water pumps (HWS/HWR DN250), and cooling tower pumps (CWS/CWR DN500). All pipe sizes, BOP elevations, and valve assemblies fully tagged and coordinated.